150,109 SF cGMP Manufacturing Facility
66,329 SF Eight (8) ISO14644-1 Class 7 Cleanrooms with HEPA Filtration
39,135 SF Two-Story Office
37,020 SF Warehouse
7,625 SF Mechanical Mezzanine
Concrete Tilt-Up Wall Panel Construction with Steel Joists and Metal Roof Decking
60-mil TOP Roof System with R-30 Insulation
32′ Clear Height
Four (4) Dock Positions
4,000 AMP, 3,500 AMP and 3,000 AMP Electrical Services
ESFR Fire Protection System with Diesel Fire Pump
Process Piping for Owner Provided Equipment Consisting of Compressed Air, Nitrogen and Vacuum Piping
Three (3) 2.5 Ton Capacity Cranes
High Efficiency HVAC Design
LEED Certification
ClientScannell Properties | Watson-Marlow Fluid Technology SolutionsServicesArchitecture, Construction Administration, Due Diligence