80,000 SF Beverage Manufacturing & Distribution Facility Expansion & Renovation
79,140 SF Warehouse
Insulated Precast Panels
Steel Joist/Girder Roof Framing
60 mil Mechanically Attached TPO Roof
23 Dock Positions with Central Air Dock Pit Levelers
Continuous Overhead Pallet Storage at Dock Positions
92 Battery Charging Locations
5,073 SF Drive-Thru Area
Two (2) 1,720 SF, Two-Story Dock Offices
5,629 SF Mezzanine Break Room & Training Room
901 SF Repack Area
738 SF Point-of-Sale Area
1,623 SF Concentrate Cooler with Insulated Metal Panels
370 SF Combustible Material Compartment in Concentrate Cooler with 12,000 Gallon Underground Containment
ClientReyes Holdings for Great Lakes Coca-ColaServicesArchitecuture, Construction Administration, Due Diligence