GMA-Design Group
  • ABOUT
  • PORTFOLIO
  • TEAM
  • SERVICES
    • ARCHITECTURE
    • HOSPITALITY
    • INTERIORS
  • CAREERS
  • NEWS
  • HOME

Interchange Cold Storage | Mt. Crawford, VA

319,014 Total SF Cold Storage Facility

117,914 SF Cold Storage Facility
– Semi-Automated Material Handling System
– 38’ Clear Height
– 60-Mil Mechanically Attached White TPO Roof Membrane
– Freon Refrigeration System
– -10°F Freezer
– 36°F Cold Dock
– Battery Charging Stations
– 6” Reinforced Floor Slab
– IMP Construction

201,100 SF Expansion
– 179,000 SF -10°F Convertible Freezer/Cold Dock Expansion
– QuickFreeze Racking Positions & Capabilities
– 13,000 SF Repack Area
– 9,100 SF, 2-Story Office & Battery Charging Area
– 25 Cold Dock Positions
– Semi-Automated Turret Truck System with Very Narrow Aisle (VNA) Configuration
– Defined Drive-Aisle Floor Slab with F-Min Specifications in Storage Areas
– Freon Refrigeraton System with Roofop Penthouses


ClientInterchange Cold StorageServicesArchitecture, Construction Administration, Due Diligence

© 2025 GMA-Design Group. All rights reserved